Installation Guide

IMPORTANT:
• ALL INSTALLATION WORK SHOULD BE DONE BY ACCREDITED PROFESSIONAL.
• SHUT OFF POWER SUPPLY AT FUSE OR CIRCUIT BREAKER!
• USE ONLY THE SPECIFIED BULBS. DO NOT EXCEED THE MAXIMUM WATTAGE!
CONNECTING THE WIRES
Have an assistant support the xture’s weight while completing the wiring. Cut away excess
wire. Attach the xture’s wires to the power supply wires from the junction box. Connect black
to smooth/black/transparent (L) wire; white to ribbed/white/transparent (N) wire; ground to
ground (green or copper). Twist the ends of the wire pairs together, and then twist on a wire
connector. Make sure all twists are in the same direction. If there is no ground wire (green
or copper) from the junction box, locate ground screw on mounting strap (B) and wrap the
xture ground wire around the green ground screw. Use a screwdriver to secure ground screw
onto the mounting bracket/mounting strap. Tuck all wires neatly into the junction box.
For Customer Service, contact
the place of purchase.
Assembly Instructions: 3306-D3, LP (Orwell)
CLEANING TIPS
Treat the xture gently! Regular cleaning will reduce the need for deep cleaning. For regular cleaning, turn o the light and wipe down
the xture with a clean lint-free cotton or microber cloth. Never spray cleaner directly onto the xture. Hand wash the glass with warm
waterand mild detergent. Dry with a lint-free or microber cloth.
PREPARING FOR INSTALLATION
Carefully remove all of the contents from the carton. See the important notes above. Shut
o the power at the circuit breaker and completely remove the old xture from the ceiling,
including the old mounting strap.
From the parts bag remove the mounting strap assembly. Mounting strap (B) contains
threaded holes. Two of mounting screws (A) should be attached to mounting strap (B). You
may need to tighten nuts (C) that hold these screws in place. Place mounting strap (B) over the
junction box so that mounting screws (A) are vertical, and in alignment with the hole locations
on the xture’s canopy (F). Secure mounting strap (B) to the junction box with mounting
screws (D) and a screwdriver. Tighten the screws securely.
ASSEMBLING THE FIXTURE
For adjusting the height of xture, this xture contains:
Three 12” rods (K) and one 6” rod (J) are included. Each rod can be connected to another by
twisting the thread end of one into the opposite end of another. Each rod may also be used
to alone to connect the xture body to the swivel (H) on canopy (F). By measuring, decide the
desired overall height of your xture and determine how many rods are needed to achieve the
desired height. Push the xture’s wires through each rod. Thread the bottom rod onto post (L)
at the center of the xtures body. Pull the wires until taut and then connect the rods together
as described above.
I
J
M
O
P
K
B
JUNCTION
BOX
D
A
E
C
F
H
G
L
Q
S
N
R
FINISHING THE INSTALLATION
Push canopy (F) up to the ceiling and tightly thread nuts (H) onto the exposed threads
of mounting screws (A).
Secure spider (N) to shades (Q) with screws (P) and decorative cap (O). Carefully slide
shades (Q) over sockets (M) and secure the shades in place with socket rings (R).
Twist light bulbs (S - not provided) into sockets (M) in accordance with the xtures
specications. Do not exceed the maximum wattage.
Your installation is now complete. Turn on the power and test the xture.
I
J
K
B
JUNCTION
BOX
D
A
E
C
F
H
G
L
M
O
P
Q
S
N
R
3306-D3
3306-LP

Summary of content (1 pages)