Installation Sheet

IMPORTANT:
• ALLINSTALLATIONWORKSHOULDBEDONEBYACCREDITEDPROFESSIONAL.
• SHUTOFFPOWERSUPPLYATFUSEORCIRCUITBREAKER!
• USEONLYTHESPECIFIEDBULBS.DONOTEXCEEDTHEMAXIMUMWATTAGE!
PREPARING FOR INSTALLATION
Carefullyremoveallofthecontentsfromthecarton.Seetheimportantnotes
above.Shutoffthepoweratthecircuitbreakerandcompletelyremovetheold
xturefromtheceiling,includingtheoldmountingstrap.
Fromthepartsbagremovethemountingstrapassembly.Mountingstrap(B)
containsthreadedholes.Twoofmountingscrews(A)shouldbeattachedto
mountingstrap(B).Youmayneedtotightennuts(C)thatholdthesescrewsin
place.Placemountingstrap(B)overthejunctionboxsothatmountingscrews
(A)arevertical,andinalignmentwiththeholelocationsonthexture’scanopy
(F).Securemountingstrap(B)tothejunctionboxwithmountingscrews(D)anda
screwdriver.Tightenthescrewssecurely.
ASSEMBLING THE FIXTURE
Rods(T,JandK)areonthexture’swires,butnotconnectedtothexture.
Connectrod(T)tothexturebodyatposts(SandQ).Bymeasuring,determine
thecorrectnumberofrodsneededforproperhangingheight.Thereare3optional
12inchrods(K)and1ofa6inchrod(L)included.Tolengthenthexture,add
additionalrods.Ifadditionalrodsareneeded,contacttheplaceofpurchaseto
order.Toshortenthexture,trimthewirestothedesiredlengthaddingatleast8
to10inchesofwiretothedesiredlength.Slideanyexcessrodsoffthexture’s
wirestodiscard.Threadthewiresthroughtherodsandpullthewiresuntiltaut
beforethreadingtherodstogether.Threadbottomrod(JorK)ontopost(L)atthe
topofthexture’sbody.Twistthetoprod(JorK)ontothethreadsofswivelpost
(I)ofcanopy(F).Locktherodinplacebytwistingscrew(G).Pullthexture’swires
throughthetopofcanopy(F).
CONNECTING THE WIRES
Supporttheweightofthexturewhilecompletingthewiring.Attachthexture’s
wirestothepowersupplywiresfromthejunctionbox.Connectblacktoblack
(orsmooth);whitetowhite(orribbed);groundtoground(greenorcopper).Twist
theendsofthewirepairstogether,andthentwistonawireconnector.Makesure
alltwistsareinthesamedirection.Ifthereisnogroundwire(greenorcopper)
fromthejunctionbox,locategroundscrew(E)onmountingstrap(B)andwrap
thexture’sgroundwirearoundthegreengroundscrew(E).Useascrewdriver
tosecuregroundscrew(E)ontomountingstrap(B).Tuckallwiresneatlyintothe
junctionbox.
FINISHING THE INSTALLATION
Pushcanopy(F)uptotheceilingandtightlythreadnuts(H)ontotheexposed
threadsofmountingscrews(A).
Carefullyslidecandlesleeves(P)oversockets(N)beforeslidingglassshades(O)
oversockets(N).
Twistlightbulbs(R-notprovided)intosockets(N)inaccordancewiththexture’s
specications.Donotexceedthemaximumwattage.
Yourinstallationisnowcomplete.Turnonthepowerandtestthexture.
For Customer Service, contact
the place of purchase to arrange
for replacement parts.
BLACK
(Hot)
WHITE
(Neutral)
GREEN
(Ground)
HOUSE WIRES
SMOOTH
(Or Black)
FIXTURE WIRES
RIBBED
(Or White)
BARE COPPER
(Or Green)
AssemblyInstructions:4309-5 (Mercer)
CLEANING TIPS
Treat the xture gently! Regular cleaning will reduce the need for deep cleaning. For regular cleaning, turn off the light and wipe down the
xture with a clean lint-free cotton or microber cloth. Never spray cleaner directly onto the xture.
R
Q
P
L
N
M
S
T
O
D
C
B
A
E
H
F
K
G
I
J

Summary of content (1 pages)