Installation Guide

DUAL OFFSET INSTALLATION METHOD
Dual offset installation methods
ensures shingles will have proper
“side laps”.
When starting a course, panels will
be cut between the “cut marks”.
The installed course should always
end on the “panel end mark”
of the course below.
Alternate between square and triangle cuts for the rst course on the wall,
this will ensure proper “side laps” for the entire installation.
6
y
y
Å
Left Side End of Wall
Correct Installation Incorrect Installation
Square Triangle
This feature is useful around windows and doors