User Manual
30
❏ 13. Position and glue the pushrod standoffs and the outer
pushrod tube in place.
❏ 14. Locate the non-adhesive backed hook and loop
material. Make two sets of straps for your receiver and battery
by joining a piece of non-adhesive backed “hook” material to
a piece of “loop” material.
❏ 15. Connect a Y-connector to each aileron channel. Connect
the other servo leads and the battery switch to your receiver.
❏ 16. Wrap your receiver and battery pack with 1/4" [6.4mm]
thick latex foam. Use the straps you made to mount your
battery and receiver to the aft equipment tray.
❏ 17. Connect the battery to the switch. Use heat shrink tubing
to secure the connection between the battery and the switch.
❏ 18. We used a 2.4GHz radio system for this build-up, but if
you’re using a 72MHz radio system an antenna routing tube
is provided for you in the upper left side of the fuselage.
Skip to the “Final Assembly” section.