Installation Guide

Refrigerant Piping
PIPING INSTALLATION
Use refrigeration grade piping ONLY. Uses of other piping will void the Manufacturer’s Warranty.
CAUTION
21
Piping Preparation
Do not open service valves or remove protective caps from tubing ends until all
connections are made.
Keep tubing free of dirt, sand, moisture and contaminants.
Use a flexible condensate drain hose to fit over the factory 5/8-inch (15mm) drainage hose.
Insulate each refrigerant pipe and condensate hose with minimum 3/8” (10 mm) wall
thermal pipe insulation.
NOTE: Insulate the interior portion of the condensate hose to prevent sweating which
may cause water stains or wall damage.
Bind refrigerant pipes, condensate hose and interconnecting wire together with cable
ties at 12 inch intervals on the exterior portion.