Operation Manual

122
GB
Assembly instructions
(picture 1)
Remove the power plug before all
work on the device. Employ only
original parts. Danger of injury.
Unpacking
Unpack the device and check whether it is
complete:
5 Carrying strap
2a+2b Two-part blower / suction tube with
4 fastening screws (3a+3b)
11 Motor casing
16 Collection bag with bag holder nozzle
Dispose of the packaging material cor-
rectly.
Mounting
Before putting the device into
operation, the blower / suc-
tion tube must be completely
mounted and screwed tight and
the collection bag and carrying
strap must be attached.
Fitting the blower/suction tube
1. Plug the two sections of the blower/
suction tube (2a+b) into each other
and screw them together (3a).
2. Plug the upper blower/suction tube
(2b) into the blowing/suction hole on
the motor casing (11).
3. Fix the blower/suction tube using the
two fastening screws (3b).
2b
21
6
5
15
16
18b
18a
11
3b 3a 2a
picture 2
1