Instructions / Assembly

www.gronomics.com East Bethel, MN USA 763-753-7374
Continued
Parts List
ITEM QTY. PART # DESCRIPTION
1 4 1900 Corner Post, 4” x 4” x 19”
2 2 1452 Side Rail w/Cleat, 14-1/2” x 5-1/2” x 1”
3 5 1450 Side Rail, 14-1/2” x 5-1/2” x 1”
4 1 1450L Side Rail, (one w/Logo), 14-1/2” x 5-1/2” x 1”
5 4 1451 Narrow Center Side Rail, 14-1/2” x 2-1/2” x 1”
6 2 1551 Corner Notched Bottom Board, 15-1/2” x 4-1/2” x 1”
7 1 1550 Bottom Board, 15-1/2” x 5-1/2” x 1”
8 4 3100 Post Cap, 4” x 4” x 1-1/2”
9 1 2002 Fabric Liner, 22” x 36”
Planter Box (18” x 18”)
Assembly Instruction
1
Parts Identi cation
Stack matching pieces in piles. Using the parts
list, locate and count the individual pieces and
verify that you have received the correct number
of pieces.
If any pieces are missing or replacement parts are
required, contact Gronomics at 1-855-299-6727.
NOTE: It is recommended to place a protective
layer between the ground and the pieces during
assembly. This will help prevent damage to the
pieces.
PB 18-18
PB 18-18S
1
2
3
4
5
6
7
8
9
Side Rail Assembly
2
Stand two 4” x 4” x 19” corner posts (Item 1) upright with slots facing each post and slots
facing you.
Locate a 14-1/2” x 5-1/2” side rail w/cleat (Item 2). With cleat located at the bottom and
facing you, install side rail w/cleat into the slots and slide down to the bottom of the slots.
Repeat procedure for the two remaining 4” x 4” x 19” corner posts and 14-1/2” x 5-1/2”
side rail w/cleat.
(Soil depth option: Cleats located as shown will provide a soil depth of
approximately 10”. Reverse side rail w/cleat installation, cleats located at
top, if a soil depth of approximately 6” is desired).
Cleat
2
1
1
Packaged & Inspected by: Date:

Summary of content (2 pages)