Installation Guide

1. Clean and Inspect
Before installation, both male and female threads must be examined and
cleaned of any substance or burrs.
2. Apply Sealant or Lubricant
A sealant/lubricant is highly recommended. First. It enhances sealing by
filling any voids in the threads. Second, it reduces the potential for galling
or seizing if the threads are forced together by over-tightening. If galling
occurs, the threads are damaged and may not seal. This damage also
prevents disassembly and reassembly. Recommended sealant or lubricants
are graphite impregnated Teflon tape, and pastes and anaerobic liquids
that are specifically manufactured for use with stainless steel threads.
Apply the sealant or lubricant according to the manufacturer’s instructions.
3. Manual Threading
By hand, carefully thread the fitting into the mating port. Screw together
until “finger tight” or slight resistance is felt.
4. Final Installation and check
Continue turning with a wrench until it completely installed.
Check the leaks.

Summary of content (1 pages)