Installation Guide

Pomona, CA Clemmons, NC Nashville, TN
Tel: 908-351-5400 www.haywardpool.com
USE ONLY HAYWARD GENUINE REPLACEMENT PARTS
12
6. Do not install within 24” of any outdoor
HVAC equipment.
7. Do not install where water may run-off a
roof into the heater. A gutter may be needed
to protect the heater.
8. Any enclosure around the heater must
provide a combustion air vent commencing
within 12 inches of the bottom of the enclo-
sure. The vent opening shall have a mini-
mum free area of 1 square inch per 4,000
btu/hr input rating of all gas appliances in the enclosure. See Table 5.
FLOORING:
This heater may be installed on either non-combustible or combustible ooring. Ultralite™ or equivalent
concrete-over-foam HVAC pads are acceptable.
TIE-DOWN BRACKETS:
The heater is equipped for installation of factory-supplied tie-down brackets if required by local codes.
The brackets are shipped in the consumer kit. You will need the following to complete the installation:
1. Tie-down brackets (FACTORY-SUPPLIED, quantity = 4)
2. Sheet metal screws (FACTORY-SUPPLIED, quantity = 4)
3. Concrete tapping screws (tapcons) (eld-supplied, quantity = 4, size to be ¼” diameter with a
minimum length of 2”)
INSTALLING TIE-DOWN BRACKETS:
1. Locate the tie-down brackets and the sheet metal screws.
2. Obtain the tap-cons. Be sure the overall length of the concrete tapping screw is at least 2”.
3. Remove the front access panel (4 screws).
4. Remove the rear access panel (4 screws).
5. Position the heater on the pad so that all tap-
cons can “bite” into the pad. Observe local codes
regarding pad construction, some jurisdictions
specify a minimum thickness for concrete pads.
6. Slip the tie-down brackets into the slots in the
front of the heater base pan from underside of
the heater, so that they are positioned as shown
in gure 3. Install the sheet metal screws through
the holes in the bracket to secure the bracket to
the heater base pan.
7. Install the tap-cons through the holes in the tie-
down brackets into the pad.
8. Repeat Steps 6 & 7 at the rear of the heater.
9. Installation is completed when (4) brackets are
secured to the heater and the pad. Install the ac-
cess panels when complete.
Equipment pad
Install sheet metal screws (supplied) at
these locations (front and rear)
Install concrete tapping screws (eld-supplied)
at these locations (front and rear)
Figure 3
Table 2
Outdoor Installation Clearances
Heater Panel Required Clearance
Top Unobstructed
Front 24 inches
Back 6 inches
Water Connection Side 12 inches
Side Opposite Water Connection 6 inches