HeatMaster® Installation, Operating and Servicing Instructions HeatMaster® 200 N HeatMaster® 200 F excellence in hot water 04/03/2004 - 66412600
INDEX INTRODUCTION INTRODUCTION 1 TARGET GROUP Target group Symbols Certification Information and safety instructions 1 1 1 2 This manual is intended for the use of: - final users of the appliance; - the engineer installing and starting up the appliance; - the engineering and design department; - the installer responsible for servicing or maintaining the appliance.
INTRODUCTION USER GUIDE GENERAL INFORMATION AND SAFETY INSTRUCTIONS USING THE BOILER General information This documentation forms part of the items delivered with the appliance and must be given to the user to keep in a safe place! This appliance must be serviced and repaired by an approved installer, in accordance with current standards in force.
USER GUIDE DESCRIPTION 5. Time clock This allows the HeatMaster® to be timed on and off and operates on a 24 hour sequence. Around the outside of the clock there are a number of white tabs, these allow 15 minute switching periods. To set the time clock simply push outwards the number of tabs required for ON period. Remember: TAB IN = HeatMaster OFF TAB OUT = HeatMaster ON 6.
DESCRIPTION CONSTRUCTION FEATURES Outer body 1 5 The outer body, containing the primary water, is made from STW 22 carbon steel. TANK-IN-TANK heat exchanger The ring-shaped inner tank with its large heating surface for producing domestic hot water is built of Chrome/Nickel 18/10 stainless steel. It is corrugated over its full height by an exclusive production process and entirely argon arc welded by the TIG (Tungsten Inert Gas) method.