Installation Guide

OVERLAY PANELS
(CONT.)
DOOR AND DRAWER OVERLAY PANEL PREPARATION (continued)
Mounting the Brackets
4) Position the brackets on each set of marks to make sure
they are aligned. (4)
Note that the support bracket mounts with its flange
toward the top of the door.
If necessary, drill starter holes in the panel. (5)
(Use a drill stop to avoid drilling through or damaging
the finish surface.)
The installation kit includes 5/8” screws. If the panel isn’t
substantially thicker than 5/8”, you’ll need shorter screws.
1) Screw the brackets in place. (6)
Drawer Panel
When preparing the Drawer Panel, follow the same
instructions as per the door panel, but make sure
measurements are taken starting from the top edge. (7)
The support bracket faces the opposite way from the door
panel bracket. (Compare images 4 and 8.)
7
8
4
5
6
©2019 Hestan Commercial Corporation
16
EN