S-BT Threaded Fastener Specification

Table Of Contents
page 14 Specifications
1
3
2.1
!
2.0
T
rec
4
1
2
3
CLICK
Marklocationofeach
fastening.
Screw-inS-BTstuds
into drilled hole.
Pre-drillwithTS-BT
stepped drill bit.
PositionchannelonS-BT
studsandholdinplace.
Tightenthenutswiththe
suitedinstallationtorque.
Pre-drilluntilshoulder
grinds a shiny ring.
The drilled hole and the
areaarounddrilledhole
mustbecleanandfree
fromliquidsanddebris.
Note:Incaseofappliedshearload,theS-BTshouldbeplacedaccordingto
illustration(endofslottedhole)
TwoS-BTstudsinoneslottedhole OneS-BTstudineachslottedhole
2.3 S-BT with MM and MQ installation channel system
MM channel system for use with S-BT-MF
MQ channel system for use with S-BT-MF or S-BT-MR
Installation instructions