S-BT Threaded Fastener Specification

Table Of Contents
Specifications page15
S-BT Screw-in threaded studs
1
3
2.1
!
!
5
1
2
T
rec
2.0
T
rec
4
1
2
3
CLICK
Marklocationofeach
fastening.
Screw-inS-BTstudsinto
drilled hole.
Pre-drillwithTS-BT
stepped drill bit.
PositionchannelonS-BT
studsandholdinplace.
Tightenthenutswiththe
suitedinstallationtorque.
Pre-drilluntilshoulder
grinds a shiny ring.
The drilled hole and the
areaarounddrilledhole
mustbecleanandfree
fromliquidsanddebris.
Fasten the accessory on
thechannelwiththe
suitedinstallationtorque.
ForfasteningtheaccessoryontheHiltichannelorbracketalwaysusethesuit-
ableHiltiwingnutincombinationwithaproperbolt.Theinstructionforuse(IFU)
accompanyingthesalespackagingoftheHiltiwingnutscomprisesdetailed
informationabouttheinstallationofthewingnutandthetighteningtorqueT
rec
.
Important notes:
Theseareabbreviatedinstructionswhichmayvarybyapplication.
Alwaysreview / followtheinstructionsforuse(IFU)accompanyingtheproduct.
Incaseofadrillthroughhole,reworkofthecoatingonthebacksideoftheplate/
prolemaybeneeded.
2.4 Fasteninginstrumentation,junctionboxesandlighting
S-BTscrew-inthreadedstudsforattachinginstrumentation,junctionboxes
and lighting to coated steel.
Installation instructions
MMChannelSystemwithwingnut
M6,M8,M10
MQChannelSystemwithwingnut
M6,M8,M10,M12,1/4″,3/8″
0