S-BT Threaded Fastener Specification

Table Of Contents
page 16 Specifications
2.5 S-BT with Hilti standoff adapter: Fastening
instrumentation,junctionboxes,lighting,installation
channel systems etc.
2.5.1 Fasteningtosteelwithapassivereprotection(PFP)coating
Installation instructions
1
4
7
!
2
T
rec
5
8
T
rec
6
Marklocationofeach
fastening.
SetS-BTstudsinto
drilledholeusingthe
S-DGBTdepthgauge.
Positionaccessoryon
standoff adapter and hold
inplace.UseofMQZ
bore plate as needed for
strutapplications.
RemovePFPandpre-drill
withTS-BT31-74PFP
stepped drill bit…
Tighten the standoff
adapterwiththe
recommended installa-
tiontorqueT
rec
of8Nm.
Fasten the accessory
on the standoff adapter
withtherecommended
installationtorque
T
rec
of 20 Nm.
Closetheopeningwithin
4hoursoftheopening
is being made in accor-
dance to the patching
instructionsbythe
PFP-manufacturer.
…untilshouldergrinds
a shiny ring. The area
mustbecleanandfree
fromliquidsanddebris.
Important notes:
Theseareabbreviatedinstructionswhichmayvarybyapplication.
ALWAYSreview / followtheinstructionsforuse(IFU)accompanyingtheproduct.