INSTALLATION GUIDE Hi sense Laser Cinema Display Screen Before you install this product, read this guide completely and make sure you understand all of the content. RSAG8.805.
[CLIT EET The Hi sense Laser Cinema Display Screen has a bezel trim and is designed to be used in rooms where the ceiling light cannot be moved. Maintaining the Screen Dust, dirt and scratches on the screen will affect how images appear. Follow the instructions below to properly maintain the scrawny. 1} The screen surface has a horizontal structure. DO NOT wipe the screen up and down or in a circular motion. Wipe from left to right only.
Hardware and Parts List for Screen Make sure you have all of the parts shown below before you begin the installation procedure. Product optimization and upgrade might cause differences of components, which are for reference only. Please refer to the actual product. No. Name Picture Qty. No. Name Picture Qty.
(Hf Note: The Installation space should be at least 3.5m x 2.5m ( 137.8 Inches x 98.43 Inches). Fn 2 3.5m (137.8 inches) 2.5m (98.43 inches) Place the Cloth Liner (F) sponge on clean area on the ground to assemble the screen. Connect Long Inner Frame (17 springs included) (A1) and Long Inner Frame (A2) with Connector (Q)} and Connector (R) to an Integrated long Inner frame, tighten M4x6 Screws (E) to secure It.
3. Insert the two Short Inner Frames (B} Into the L Corner Piece (C) and L Elbow Joint (D) as shown In the diagram below. Al A2 BED 4. Fasten the four angles with the M4x€ Screws (E). First fasten screws marked by Oo then fasten screws marked by 0 In the following figure. Make sure all four comers are properly In place to form a perfect square.
5. Mount the Vertical Beam (O) to support frames, ensues that the vertical beam Is at the Joint of Long Inner Frame (17 springs included) (A1) and Long Inner Frame (A2) and fasten with four M3x7 Screws (N).
Screen Material Installation) Please read this Important note before proceeding with the Installation process of the material: Before handling the Reflecting Screen (H), put on the supplied pair of White Gloves (shared with the Laser Cinema, see the Laser Cinema cleaning kit) to avoid leaving fingerprint marks, dust or oil from your hands on the surface of the material (Figure 1). The Reflecting Screen (H) Is very delicate and should be handled with extreme care. Do not allow the material to fold or bend.
4. Carefully and gently place the assembled frame on top of the screen material. Align the screen material comer with the comer of assembled frame as the diagram below. In order to avoid puncturing the material, do not allow the angled edge of the frame to come in direct contact with the screen. Tip: Make sure the back of the screen material is facing up as shown in this figure. 5.
Use the Spring Hook (K) to attach Repeat until all of the springs are springs to holes located on both Installed. horizontal and vertical outer edge of the screen material. Stretch the screen material in the direction of the arrowhead. Tip: The screen material Is In the best position when the outer edge Just covers M4x6 Screws (E} labeled above. 2) After you've installed the comer of the material, assemble the spring in the order (D — @ shown below.
Outer F 1. Connect Long Outer Frame (L1) and Long Outer Frame (L2} with Connector (S} to an integrated long outer frame, tighten M3x7 Screws (N) to secure it. e Installation L1 Ha L1 Vain L2 M3x7 Screws (N) wale 2. Place the outer frame along the four edges of the screen material comer, ensure that Long Outer Frame (L1) with logo at the bottom right. 3. Place all the frame pieces along the edge of screen material.
4. Place the L Corner Fitting (P) on the four comers. When the L Corner Fitting (P} fits the outer frame completely, then tighten the screws into holes . M23x7 screw (N) Attention: * You are not suggested to screw the plastic L Corner Fitting (P) too tight because high twisting force could cause slip of L comer fitting. The proposed force is less than 0.3 NM. 5. For the long frame, 6 screws need to be used; for the short frame, 3 screws need to be used.
stalling the Wall Mount Brackets) Check the Type of Wall You Have Minimum solid concrete thickness: 8 in. (203 mm) Minimum wood stud size: common 2x4 in. (51 x 102 mm) nominal Minimum concrete block size: common (203 x 203 x 406 mm} Place screen onto the wall-mount brackets. Prepare Your Space CHECK THE SIZE OF YOUR SPACE + Width 2 100.39 Inches (2.55 m}) + Height 2 66.93 inches (1.7 m) from the installation surface to the ceiling.
Connecting the Wands Connect the wands as shown in the illustration below. Install the Wall Mount Brackets NOTE: Make sure you have your paper template, pencil, tape, level and screwdriver. 1. Starting from the top of your Cinema stand, add 61.89 m) above it to get the height of the top of the paper template. Mark the height onto the wall. 2. Put the paper template on the center of the wall. NOTE: The paper template should match the mark you made on the wall. 3. Make sure the paper template is level.
Install the brackets with the screws Drill the holes 2¢ IF YOU HAVE A SOLID CONCRETE OR CONCRETE BLOCK WALL NOTE: Make sure you have your concrete anchors and hammer. 4. Drill holes for the top screws. Following the vertical line on the paper template, drill holes for the bottom screws within the proposed area. 5. Remove the paper template and insert four anchors into the holes. Be sure the anchors are flush with the concrete surface. 6. Install the brackets with the screws and firmly tighten them.
1. We strongly recommend that two people handle this screen when moving it. Be sure to use gloves (included) to protect the screen from grass, sweat and dirt. 2. Place the assembled screen vertically on the ground. Look at the screen horizontally, and if you find the material is black, it is in the correct direction and ready for mounting on the wall. However, if the material is white, tum around the screen and then install it. 3. Split the release paper on one side of the Velcro strips.
If the screen is higher than the image, then rotate the wands clockwise and move the screen down. If the screen is lower than the image, then rotate the wands counterclockwise and move the screen up. After you've completed adjusting the screen height, remove the handles. Fold and rest the wands on the screen bracket on the bottom of the screen. 6. Make sure the screen is horizontally and vertically level.