Instructions

ASSEMBLY
HOLZMANN MASCHINEN GmbH www.holzmann-maschinen.at 16
LK 4ESZ
13 ASSEMBLY
Please check the product contents immediately after receipt for any eventual transport damage or
missing parts. Claims from transport damage or missing parts must be placed immediately after
initial machine receipt and unpacking before putting the machine into operation. Please
understand that later claims cannot be accepted anymore.
AT TE N TI ON
Ensure conscientious assembly of the machine.
Measure the flange width of the track carrier and ensure compliance
Install the machine in accordance with the width of the carrier and the
intended lifting variant (chain pulley train or electric cable pull).
There must be a gap of 2mm between the carrier flange and the track ring
of the rollers. Internal dimension = flange width + 4mm.
Tighten firmly all bolts, using washers and snap rings.
At regular intervals, please check the fastening clamps for any damage,
cracks, etc.
Ensure that the support, where the machine will be mounted is securely
mounted.
Never exceed the maximum payload!
The operator is responsible for selecting and dimensioning the
appropriate supporting structure
13.1 I-steel track dimensions
h
b
d
t
r
100
68
4,5
7,6
3,3
126
74
5
8,4
3,5
140
80
5,5
9,1
3,8
160
88
6
9,9
4
180
94
6,5
10,7
4,3
200
100
7
11,4
4,5
200
102
9
11,4
4,5
220
110
7,5
12,3
4,8
Dimension in mm