Installation Guide

DENALI PINE 8MM | FOLD DOWN MODEL #41394
3/4
HOMEDEPOT.COM/HOMEDECORATORS
Please contact 1-888-864-4520 for further assistance.
Room Preparation
WALL BASE/TRIM
Removal of the existing wall base/trim is optional. If the existing
wall base/trim is not removed, leave the required expansion
space in front of the existing wall base/trim.
Install wall base or trim after the flooring installation is complete
to cover the expansion space around the perimeter of the room.
Always nail/adhere the wall base and trim to the wall. Never nail/
adhere it to the laminate flooring.
DOORS/DOOR JAMBS
Undercut door jambs so that the laminate floor can be installed
under them. To do this, use a laminate flooring off-cut and a
small piece of underlay to support a hand saw blade at the
correct height for undercutting.
Check the door clearances and make any necessary height
adjustments before installing laminate floors.
Leave the correct expansion spacing under the door jamb.
WALL IRREGULARITIES
Walls are not always perfectly straight. Home Decorators Collection
laminate floors need to be cut so as to fit within the irregularities of
your walls. Complete these steps:
1. Install the first row of laminate floors (following the Installation
section) and ensure that all long edges of the laminate flooring
planks are aligned.
2. Slide the whole row against the wall. You will now notice any
irregularities (areas where the wall is not straight).
3. Trace the contour of the wall onto the row of laminate flooring
with a pencil or marker.
4. Once traced, uninstall the planks carefully so as not to damage
the locking system and cut along the traced line.
5. Re-install the plank, leaving the necessary 3/8 in. (10 mm)
expansion space.
Preparing for Installation
Before you begin the steps in the Installation section, ensure you
have completed the following:
Sort planks before installation to avoid plank repetition and to
achieve the most natural and varied results.
Inspect every plank for damage before installing it.
The first and last row of the installation should be wider than 3.5
in. (9 cm):
Measure the width of the room and divide it by the width of the
planks you are installing.
If the remainder is less than 3.5 in. (9 cm), cut 3.5 in. (9 cm)
from the width of the first row. If this is not possible, ensure
that both edge planks are as even in width as possible.
The first and last plank in a row should be a minimum of 16 in.
(40 cm) long.
Stagger the planks from row to row by a minimum of 16 in. (40
cm).
Use spacers to maintain the 3/8 in. (10 mm) expansion space
between the planks and walls/vertical objects.
Select a starting corner of the room and work from left to right.
TIP: It is often easiest to start at the door of the room so that the
first plank can be easily slid under the door jamb.
Installation
1 INSTALLING THE FIRST ROW 2 INSTALLING THE REMAINING ROWS
Lay the first plank with the long edge tongue facing the wall.
Position the short edge tongue of the second plank so that it overlaps
the short edge groove of the first plank by half the width of the plank.
Press down on the second plank so as to engage the locking
mechanism and physically connect it to the first plank.
The two planks should lock together tightly and there should be no
height differences between them.
Slide the second plank horizontally towards the wall until the two
planks’ long edges are aligned.
Continue in this manner until the first row is complete.
Use the remainder of the last plank of the first row to start the second
row provided that it is a minimum of 16 in. (40 cm) long. If the cut
piece is shorter than 16 in. (40 cm) long, cut a new plank in half and
use it to begin the second row.
Install the first plank of the second row by installing its
long edge to the previous row’s groove.
Install the long edge of the plank to the previous row.
Before lowering the plank, make sure its short end tongue
overlaps with the previous plank’s short end groove.
Lower the plank slowly (a short oscillating or up and down
motion may help lower the plank).
Apply pressure to the short edge of the planks so as to
activate the locking mechanism. You will typically hear an
audible click sound.
When you are finished installing all rows, remove all wall
spacers and install wall base and applicable moldings/
transitions.