Installation Guide

8
Assembly - Hanging the Fan
Attaching the fan to the electrical
box
Hanging the fan
Loosen the two outlet box screws (GG) in the outlet box.
Pass the 120-Volt supply wires through the center hole in the
mounting bracket (A).
Slide the mounting bracket (A) on to the outlet box screws (GG)
and center the mounting bracket (A) in relation to the outlet box.
If necessary, use leveling washers (not included) between the
slide-on mounting bracket (A) and the outlet box. The at side of
the slide-on mounting bracket (A) should face toward the outlet
box, as shown.
Securely tighten the two outlet box screws (GG).
Carefully lift the fan-motor assembly (E) up to the slide-on
mounting bracket (A).
Insert the ball portion of the ball/downrod assembly into
the socket of the slide-on mounting bracket (A).
Turn the ball/downrod assembly clockwise until it is seated
with the tab of the slide-on mounting bracket (A) aligned
with the slot in the ball.
1
2
WARNING: To reduce the risk of re, electric shock or personal
injury, mount to outlet box marked Acceptable for fan support
of 35 lbs. 15.9 kg) or less”, and use screws provided with the
outlet box.
A
GG
GG
A
B
E
C
D
J
NOTE: The mounting bracket (A) is designed to slide into place
on an outlet box with the outlet box screws (GG) installed.