Instructions / Assembly

Installationadvice.com Solutions & Tools for problems that may arise
Stair Riser
Sub Floor
Flooring
Step 5
The tape may not sufficiently adhere to the rougher stair
or subfloor surfaces. Allow at least 24 hours for the
construction adhesive to form a bond. You should
always start at top of stairs and work your way down
to avoid contact with the installed moldings until cured.
NOTE: Complete cure takes 48-72 hours.
Step 4
Touch the bottom of molding to the stair riser and carefully
roll the stair nose in place. Make any final adjustments
before you push the molding all the way down. Once it’s
in the final position, press down firmly with your hands and
make your way down the entire stair nose. It may take 2 or
3 passes to set it firmly in place.
Stair Riser
Bottom of
Stair Nose
Step 3
Next, apply a generous bead of a Premium Polyurethane
Construction Adhesive along the entire inside corner.
Be sure to overlap the tape with the adhesive. Reveal
edge of plank may show when VersaEdge is installed. To
compensate, apply a little more adhesive to the molding.
Step 1
Install the riser flush to the stair. Use VersaEdge to determine
where to start your flooring. VersaEdge must fit snuggly next to
plank. Remove VersaEdge and glue the flooring plank down.
Clean flooring and molding as directed below:
Step 2
Turn VersaEdge over and roughen the inside surface of the
VersaEdge to increase bond by means of 60 grit sandpaper,
sanding sponge, or a metal brush. Then, gently peel the
release paper all the way off the adhesive tape.
VersaEdge Stair Nose
CLEANING PREPARATION FOR BOTH SURFACES
Preparing the floor & molding as outlined is mandatory
to achieve the required bonding strength
1. Use a damp cloth (water only) to clean both surfaces of loose
particles or surface films.
2. Roughen the surfaces with sandpaper (100-150 grit), sanding
sponge or metal brush. For flooring, only roughen up area that
will be covered (1.25” to 1.5”).
3. Degrease both surfaces to remove all traces of oil, grease, dust,
and fingerprints by using a light solvent such isopropyl alcohol
(Refer to the manufacturer’s recommendations for additonal
safe cleaning agents).
4. Let both surfaces dry thoroughly before applying adhesive.
Use VersaEdge to Position Flooring.
Molding MUST touch flooring!
Plank MUST be Glued Down
Stair Riser
Sub Floor
Flooring
Adhesive Tape
PUR Adhesive
(Add a little
more adhesive
to make the
VersaEdge
even with floor)
PUR Adhesive
5
Installation on 3mm LVT flooring
“Flush Lock-Down Installation
Flooring with an overall thickness of
3
mm
Roughen up surface that
comes in contact
with glue
Painter’s
Tape to
protect
ooring
Sub Floor
LVT
Adhesive Tape*
VersaEdge Surface
Roughened up with
Sanding Sponge or
Sandpaper
*The purpose of the double-sided tape is to secure the
molding firmly in place until the premium polyure-
thane construction adhesive totally cures.
Release Paper
PUR Adhesive
Caulk Gun
Adhesive Tape
Underside of molding
generously covered
with PUR adhesive