Installation Guide

16
Installation Practices
the trench until after the pressure / leak test has been completed (see Section “4.4 Pressure
and Leak Testing” on page 18) and the system has passed inspection by the local authority
having jurisdiction (AHJ).
4.3 Fitting Assembly Overview
HOME-FLEX
TM
Underground IPS fittings are for use with IPS sized yellow poly gas
pipe that has been approved for use with natural gas and propane.
Body Flange
NutNut
Stiffener
Tubing
Step 1 Check contents
Each product package includes a fitting
and a number of stiffeners to be used on
each end of pipe being connected (i.e. 2
stiffeners for a Coupler or Elbow, 3 for a Tee).
Step 2 Cut the pipe square
There is no need to chamfer the pipe end.
Ensure any burrs on the pipe are removed
and the pipe is clean.
Step 3 Insert stieners
Insert the supplied stiffeners into each end
of the pipe being connected.