Installation Guide

12
System Conguration and Sizing
Figure 3.2 2 PSI LP Gas Second-Stage Regulator To Garage, Outbuilding Or Appliance.
Step 1 Call 811 at least 3 days prior to digging to have any underground utilities marked prior
to digging.
Step 2 Determine length of gas piping from connection point at second stage regulator outlet
to riser outlet at the outbuilding or appliance. Include the distance required to connect the
riser to the gas piping system near the meter. This connection must be made using rigid pipe
or CSST that is at least the same size as the PE pipe size.
Step 3 Determine the number and type of HOME-FLEX Underground® ttings that are
required in the system. Add the equivalent number of feet from Table 5.1 “Length to Add to
Each Run for Each Fitting” on page 21 of this guide to the number of feet calculated above.
Step 4 Determine the appropriate LP Gas sizing table based on the Second-Stage Regulator
pressure and allowable pressure drop using the appropriate sizing table in Chapter 5. For
example, Table 5.5 on page 25 can be used for low pressure LP gas with a pressure drop of
0.5" w.c. Find the nearest length that is equal to or greater than the length calculated in step
above. Follow the row across until the number of BTU’s provided is equal to or greater than
the required BTUs required for this run- check the column header for required pipe diameter.
Elevated Pressure (10 PSI ) LP Gas
In this scenario, an underground polyethylene gas line is being run from the outlet of the LP
Gas tanks First-Stage Regulator to the Second-Stage Regulator.
Figure 3.3 10 PSI LP Gas First-Stage Regulator (Tank) to Second-Stage Regulator (House)
Step 1 Call 811 at least 3 days prior to digging to have any underground utilities marked prior
to digging.
Step 2 Determine length of gas piping from connection point of riser near rst-stage regulator
outlet to riser outlet at the second stage-regulator. LP provider will make connection from
rst stage regulator to riser.