Installation Guide

www.homelegend.com
DOC: HWH-V001
12 | Page
Glue Down Installation
Finishing Touches
Clean the oor.
Install or reinstall all wall trim pieces. Nail them through the wall, but not to the suboor to avoid restricng the expansion gap.
Step 4 – Install the Remaining Rows
a) Spread another secon of glue. Never spread more that
can be covered before the adhesive is set. If adhesive is set
and will not transfer to the back of the plank, scrape o
the adhesive and apply fresh adhesive.
b) Connue to install the next rows.
c) Make sure there is a random staggering at the end
joints of at least 6” apart. Be aenve to staggering the
ends of the boards correctly in adjacent rows to avoid
clustering end joints.
d) Ensure that a 3/4” expansion gap is maintained around the
pe
rimeter of the room.
e) Make sure that there is 100% adhesive contact between
the underside of the planks and suboor. Any excess
glue which seeps onto the surface of theoor must be
removed immediately with adhesive remover. Do not
apply on T&G edge.
f) Tap the planks together unl the tongue and groove
are in place. Be careful NOT to damage the face of the
planks. Use a clean, smooth, 75-pound roller to roll the
ooring immediately aer installaon and aer every
150-square foot interval during the installaon to
insure proper adhesive transfer.
g) The Pull Bar helps you reduce seams in ght spaces, that
can't be reached with a tapping block while the glue dries.
h) Theooring should be taped together during installaon
using painters tape to keep the planks from moving during
installaon while the glue dries. The tape must be le in
place for a minimum of 24 hours.
i) Aer the installaon is completed, keep theoor free
from foot trac for a mini
mum of 24 hours to allow
adhesive to properly set.
4a4a 4b 4c
4d
4e
4f 4g 4h