Instructions / Assembly

Customer Service Hotline 1-877-693-PURE
Page 6
Home Master® Reverse Osmosis SystemOwners Manual
holes free from splinters and sharp edges. [Alternate route for refrigerator line -- run ¼”
refrigerator tubing along the baseboard, and enter the kitchen sink cabinet by drilling a ¼”
opening in the bottom board of your kitchen sink cabinet, towards the front baseboard.] Push
tubing through the cabinetry holes from the Home Master® RO to refrigerator. Allow 2-4’ of
extra tubing at the refrigerator, and position it so that it cannot be crushed or otherwise
damaged while rolling the refrigerator. Connect the female metal fitting from the refrigerator
kit to the male metal fitting on the refrigerator. Make sure all male metal fittings are
thoroughly Teflon taped to prevent leaks. Do not roll back refrigerator until the Home
Master® RO is fully installed and operational. IMPORTANT: Make sure shut off valve on the
refrigerator connection kit at the Home Master® RO is in the CLOSED position, where the
blue handle will be perpendicular to the body until after the fill and drain procedure has been
performed at least twice. Also remember to dump the remaining ice and flush the water
center prior to use.
4. Mount the Home Master® RO - Identify location for installing mounting clips for the
Home Master® RO filter cluster. Location should allow room for the reserve tank, for
connecting and disconnecting the unit, and enough room for performing general service on
the unit. Typical locations are on either right or left side, near the back wall. Use supplied
mounting clips and mounting template located inside back cover. Home Master® RO should
be mounted vertically where the drain line out is on the bottom of the Home Master® RO.
Once mounted, insert ORANGE 1/4” tubing into EZ adapter used in step 2.
> VIDEO INSTALLATION INSTRUCTIONS AVAILABLE ONLINE <
5. Connect System to RO faucet Insert BLUE 3/8” tubing into RO faucet adapter. Push
tubing all the way in, then pull back gently to check fit. Most push-pull fittings take about a
¼” of tubing inserted into them.
6. Install reserve tank and connect reserve tank tubing
Using eyedropper or a small spoon, place a few drops of
unscented (regular) bleach inside the 1/4threaded water
nipple at the top of the storage tank. Wait 2 minutes then
shake out into sink. DO NOT touch the air nipple near the
bottom of the tank found under a blue cap. IMPORTANT: Wrap
white plumbers pipe tape 5 times around the 1/4” water nipple
on top of the reserve tank. Hand tighten the reserve tank shut
off valve to the 1/4” water nipple until it is snug. Do not over
tighten. Insert BLACK 3/8” tubing into the tank shut off valve.
Push tubing all the way in, then pull back gently to check fit.
Most push-pull fittings take about a ¼” of tubing inserted into
them. Make sure reserve tank shut off valve is in the CLOSED
position, where the blue handle is perpendicular to the body
and tubing. Affix product label found in the parts bag to the top
of the reserve tank.
Customer Service Hotline 1-877-693-PURE
Page 11
Home Master® Reverse Osmosis SystemOwners Manual