HP 1405 Switch Series Installation and Getting Started Guide (May 2013)

2-3
Installing the HP 1405 Switches
Installation Procedures
Installation Procedures
These steps summarize your switch installation. The rest of this chapter
provides details on these steps.
1. Prepare the installation site (this page). Make sure the physical
environment into which you will be installing the switch is properly
prepared, including having the correct network cabling ready to connect
to the switch and having an appropriate location for the switch. See page
2-2 for some installation precautions.
2. Verify the switch passes self test (page 2-4). Plug the switch into a
power source and observe that the LEDs on the switchs front panel
indicate correct switch operation.
3. Mount the switch (page 2-6). The switches can be mounted on a wall
or on a horizontal surface.
4. Connect power to the switch (page 2-8). Once the switch is mounted,
plug it into the main power source.
5. Connect the network devices (page 2-8). Using the appropriate
network cables, connect the network devices to the switch ports.
At this point, your switch is fully installed. See the rest of this chapter if you
need more detailed information on any of these installation steps.
1. Prepare the Installation Site
Cabling Infrastructure - Ensure the cabling infrastructure meets the
necessary network specifications. In Appendix A, see, “Cabling and
Technology Information Specifications” for more information:
Installation Location - Before installing the switch, plan its location and
orientation relative to other devices and equipment:
On the back of the switch, leave at least 7.6 cm (3 inches) of space for
the twisted-pair cabling.
On the back of the switch, leave at least 3.8 cm (1 1/2 inches) of space
for the power cord.
On the sides of the switch, leave at least 7.6 cm (3 inches) for cooling.