HP 3PAR Management Console 4.5.1 Software User Guide

DescriptionColumn
The type of task scheduled, for example, Compact CPG or Create Virtual
Copy.
Type
The user who created the scheduled task.Created by
The status of the scheduled task.Status
Indicates whether an alert is generated if the scheduled task fails.Alert on Failure
Indicates the next time the task will be executed.Next Run
Text description of the tasks recurring schedule.Recurrence
The detail pane provides the same information as the list pane with the addition of the following:
System SN The serial number of the system.
Command The corresponding CLI command for the scheduled task.
You can access the scheduler using any of the following methods:
Main Actions Menu On the Actions menu, there is a submenu called Scheduled Task under
the Task menu. This allows you to schedule a task, or to edit, suspend, resume or remove an
existing schedule.
Tasks & Schedules Manager
Common Actions panel Contains options for creating schedules for the following: create
a virtual copy, create a consistency group virtual copy, compact a common provisioning
group, or adaptive optimization.
The Toolbar Contains options to create schedules, and to edit, suspend, resume, and
remove a schedule. At least one row in the table displayed in the Management Window
must be selected to enable the Edit, Suspend, Resume, and Remove scheduling actions.
These four actions are also on the table right-click popup menu.
448 Tracking and Scheduling Tasks