Voltaire InfiniBand Interconnects - Read This First Documentation Roadmap

Title/Publication Date/Contents
Voltaire Switch User Manual for Grid Directors ISR 9096 and ISR 9288 and Grid Switch ISR
9024 (March 2007)
Topics covered include:
InfiniBand, ISR 9024, ISR 9288/9096, and Voltaire switch management overview
CLI overview
Initial system setup
Installing the GridVision Integrated Manager
Updating, backing up, and upgrading the software
GridVision Graphic Device Manager
GridVision Integrated Graphic Fabric Manager
Detailed description of Fabric Manager
Node name settings
tConfiguring the fabric – Subne Manager
Bad ports configuration mode
Configuring routing algorithms
Partitioning and networks
Configuring quality of service (QoS)
Configuring nodes
Rack grouping
Configuring FTP
Large-scale operations
Fabric diagnostic overview
Configuring the fabric – Performance Manager
Setting traps, events, and alarms
Logs
Absent/Disconnected elements
Additional tools and examples
Diagnostic utilities
Configuring the Cluster Monitor
Fabric diagnostics suggestions
CLI commands reference
Port counters fields
Supported traps and events
22