Data Center Fabric Manager Enterprise User Manual v10.3.X (53-1001357-01, November 2009)

DCFM Enterprise User Manual 313
53-1001357-01
Configuring an end-to-end monitor pair
8
FIGURE 116 Set End-to-End Monitors dialog box
2. Select the fabric for which you want to configure end-to-end monitoring from the Fabric list.
3. Select an initiator port from the Select an initiator port table.
4. Select a target port from the Select a target port table.
5. Click the right arrow to move the selected initiator and target ports to the Monitored Pairs
table.
The system automatically determines the initiator SID and the target DID identifiers for the pair
and displays them in the Monitored Pairs table.