HP XP P9000 Replication Manager Software 7.5.0-00 User Guide (TB584-96070, July 2013)

On the day that daylight savings time starts, a task scheduled for the skipped time period (for
example, from 2:00 to 2:59) is executed one hour later. For example, a task scheduled for
2:30AM on that day is executed at 3:30AM.
When daylight savings time ends, an overlapping time period occurs and a task scheduled
for that time is executed once. For example, if a task is scheduled for 1:30AM, the task is only
executed for the first instance of 1:30AM and not the second (when the time change occurs).
For best results, do not use the Change Pair Status Wizard or Edit Task dialog box to schedule a
task that will be executed when the system time will be adjusted for daylight savings time.
Related topics
About copy pair status, page 209
Changing the copy pair status for each copy group or container, page 233
Changing the copy pair status for each copy pair, page 232
Changing the copy pair status for multiple copy pairs (batch operation), page 235
Pair status transitions (when the target is a copy group)
The following table lists possible pair status transitions for each combination of copy pair state and
copy type, when the target is a copy group.
Pair status conditions where the pair status can be changed (1/2) (when the target is a copy group)
Continuous Access
Asynchronous
Continuous Access
Synchronous
Business CopyCopy pair state
split
resync
restore
delete
split
resync
restore
delete
split
resync
restore
delete
Error (PSUE)
------Error (HOLDER)
split
resync
restore
delete
split
resync
restore
delete
--Error in LUSE*
split
resync
restore
delete
split
resync
restore
delete
split
resync
restore
delete
Split (Full)
split
resync
restore
delete
split
resync
restore
delete
split
resync
restore
delete
Split (SW)
------Split (HOLD)*
Managing pair life cycle222