HP XP P9000 Replication Manager Software 7.5.0-00 User Guide (TB584-96070, July 2013)

Confirming copy status during task execution
To confirm copy status during task execution:
1. In the Explorer menu, choose Tasks and then Tasks.
A list of tasks is displayed in the Tasks subwindow.
2. Select a task and click the copy group name hot link.
The copy-group-name subwindow is displayed
3. Confirm the copy progress and whether the pair is in Copying status.
4. After several minutes, click Refresh Copy Group.
5. Confirm whether the pair is in Pair status.
6. On the Tasks window, verify task has completed by checking if the task status is Success.
Related topics
About copy pair status, page 209
Advanced pair operations and recovery scenarios
In addition to the basic pair operations (such as split and resync), the Change Pair Status Wizard
supports several advanced operations for open system pairs. The relationship between the basic and
advanced operations can be understood in terms of two scenarios:
Takeover (the pair is split apart or swapped)
Takeback (the pair is recovered)
The following table describes the relationship between basic and advanced operations.
Table 13 Takeover and takeback scenarios
Advanced operationBasic operationScenario
takeover
swap
force split
splittakeover
swap
takeover-recovery (resync)
takeover-recovery (recreate)
resync
create
delete
takeback
The basic operations are simple and low-level operations for splitting, re-synchronizing and restoring
specific copy pairs. The advanced operations are provided by the P9000 RAID Manager
horctakeover command and extend recovery to site-level operations:
If a primary site is damaged and operation cannot continue, the takeover operation is used to
immediately continue operations at a secondary site.
When the damaged primary site is recovered, the takeback operation is used to immediately
switch operations from the secondary site back to the primary site.
User Guide 237