Data Protector Express User's Guide (TC330-96002, October 2010)

Failed jobs If a job fails, it will not automatically be run again. However, you can manually rerun by
clicking the Run command in the command bar.
Pausing and continuing a schedule You can stop a scheduled job from running for a period of time by
clicking the Pause Sc h edul e comma nd in the command bar. To turn the scheduled job back on, click the
Continue Schedule command in the command bar. As with the initial a nd skipped jobs, the scheduler
will start again with the largest schedule interval that was skipped.
Forcing a run At times it may be desirable to start a job before it’s scheduled time. Clicking the Run next
sch edul e command in the command bar will cause the next scheduled interval to be run immediately. The
job will not be run again when it’s originally scheduled time arriv es. And forcing a run to start ahead of
schedule will not affect the scheduling of subsequent runs. They will run at their normally scheduled time.
54
Scheduling, Rotations, and Media Management