FW 05.01.00 and SW 07.01.00 HP StorageWorks SAN High Availability Planning Guide (AA-RS2DC-TE, June 2003)

Planning Considerations for Fibre Channel Topologies
72 SAN High Availability Planning Guide
Consider the data traffic capacity of the department or workgroup (normal and
peak load) as part of the switch planning and installation process.
Such capacity planning:
Ensures loop traffic is distributed and balanced across servers and storage
devices.
Identifies traffic bottlenecks and provides for alternate connectivity
solutions if required.
Assists in calculating scalability to satisfy nondisruptive growth
requirements or eventual connection to a Fibre Channel switched fabric.
Capacity planning is a dynamic activity that must be performed when new
devices, applications, or users are added to the department or workgroup loop
configuration.