FW 07.00.00/HAFM SW 08.06.00 HP StorageWorks HA-Fabric Manager Appliance Installation Guide (AA-RU5FC-TE/958-000324-002, March 2005)

b. Measure and record the depth of the right side of the cabinet from the
inside of the front vertical rack-mounting standard to the inside of the
rear vertical rack-mounting standard.
3. Using a #2 Phillips screwdriver and eight (8) of the ten pan-head Phillips
screws (#10 x 1/2) and, if you are installing the server in an HP 9000, 10000
or 11000 rack, eight (8) square alignment washers, attach four (4) three-hole
bar nuts to the rack-mounting standards as follows:
a. Aligneachthree-holebarnutwiththerack-mountingstandardasshownin
Figure 5. Ensure each bar nut is mounted with the n arrow side (drilled
holes-to-edge side) facing the inside of the cabinet.
Figure 5 Three -hole bar nut alignment
NOTE:
Ensure the bar nut screw washers to do not overlap the inside edges of
the rack-mounting standards and mounting brackets. Washer overlap may
interfere with slide rail operation.
20
Installation