HP Insight Control for Linux 6.0 User Guide

24.1.4 HP authorized resellers
For the name of the nearest HP authorized reseller, see the following sources:
In the United States, see the HP U.S. service locator website at:
http://www.hp.com/service_locator
In other locations, see the Contact HP worldwide website at:
http://welcome.hp.com/country/us/en/wwcontact.html
24.1.5 Documentation feedback
HP welcomes your feedback. To make comments and suggestions about product documentation,
send a message to:
docsfeedback@hp.com
Include the document title and manufacturing part number in your message. All submissions
become the property of HP.
24.2 New and changed information in this edition
The following changes have been made in this edition:
The following information has been added:
“HP Insight Control for Linux licenses” (page 11)
“Validating RPM signatures” (page 17)
“Network configuration and DHCP requirements” (page 18)
“Trusted certificates” (page 22)
Chapter 2 (page 25)
“Discovering bare-metal servers using virtual media” (page 39)
“Changing the boot method” (page 42)
“Copying virtual machine OS into the repository” (page 77)
Automating a custom OS installation” (page 77)
“Installing VMware ESX and VMware ESXi operating systems” (page 91)
“Firmware update time out” (page 102)
“Increasing the number of servers that can be discovered concurrently” (page 206)
“Changing the IP address of the CMS ” (page 206)
Chapter 22 (page 211)
“Troubleshooting virtual media problems” (page 256)
The following information has been changed:
“Discovering bare-metal servers using PXE” (page 37)
“Installing HP Insight Control for Linux management agents” (page 57)
“Registering operating systems” (page 64)
“Copying SLES version 10 or version 11 into the repository” (page 71)
Additional prerequisites for certain ProLiant servers” (page 88)
“Creating and installing virtual guests” (page 141)
“Establishing monitoring for virtual hosts and virtual guests” (page 144)
“Monitoring Metrics in real time” (page 168)
The following information has been removed:
A section titled “Prerequisites for ProLiant BL495c G5 server blades” was deleted;
relevant information was incorporated into “Prerequisites to OS installations on managed
systems” (page 87)
Appendix A, Sample output from SNMP configuration session
260 Support and other resources