HP Insight Control Power Management 6.2 User Guide

Insight Control power management.
* Insight Control power management is supported.
For the incorrect PDU/PDR settings, the message will be displayed as:
* Checking for SNMP protocol support on system.
Result: The system did not respond to SNMP.
Verify security settings and community strings
in Options->Security->Credentials->System Credentials.
...
* Checking if this system is supported by
Insight Control power management.
* Insight Control power management is not supported.
When you rename the Systems Insight Manager discovered systems,
enclosures, or racks in power management, the renamed names will be
restored to the original names during the next discovery.
Solution
: Perform the following to resolve the problem:
1. From the Tools and Links tab of the System page, click Edit System Properties.
2. Select Prevent the Discovery process from changing this system name and click OK.
When incorrect iLO credentials are entered for the servers in an enclosure,
the progress bar window will run indefinitely during EDPC setting.
Solution
: Close the progress bar window. Provide the correct iLO credentials for the servers in the enclosure
and try setting EDPC.
Data Center Power Control Rule Users must be authorized for Monitor Tools.
When you do not have proper user authorization for Data Center Power Control and simulate or execute a
rule, the following message may be displayed:
An error occurred while running the rule. Please make sure the user is
authorized for DCPC tool in HP SIM.
Suggested action: To avoid this error, you must have authorization for Monitor Tools for each possible
target of a rule. The administrator (with authorization to configure Central Management Server security) must
establish this through OptionsSecurityUsers and Authorizations.
Rules take longer to start when invoked or simulated against a large number
of systems
When a Data Center Power Control rule is invoked or simulated against a large number of systems (hundreds
or thousands), it can take several minutes for the rule preview page to appear or the rule simulation to start
running. During this delay, the browser will show a progress indicator. If the browser session that invoked
the rule or simulated rule is closed, or navigated away from the progress indicator page, the rule or simulated
rule will not proceed.
During this rule start-up delay period, if any browser session attempts to enter Data Center Power Control
pages, those browser sessions will also show a progress indicator until the preview processing is complete.
This is true even if the original browser session is closed or navigated away from the progress indicator
page.
If many user sessions are active on the CMS at the same time, the rule start-up delay period can be
proportionally longer.
Power history calculation
For the non-monitored power distributors and power consumers, it is possible for power management
sometimes to determine their power history from other sources. Power history calculation is supported for
When you rename the Systems Insight Manager discovered systems, enclosures, or racks in power management, the renamed
names will be restored to the original names during the next discovery.
31