Backing up and restoring HP Insight Management 7.3 Central Management Server (Windows)

Technical white paper | HP Insight Management 7.3
During the second phase of the Virtual Connect Enterprise Management section, mxsync issues requests to VCEM to
resynchronize each VC Domain managed by VCEM.
Notes:
During the analysis step of phase 2, mxsync displays an ISSUE for each VC Domain managed by VCEM, stating that the
VC Domain may need to be synchronized with VCEM. This is only a potential issue. The test to determine if the VC
Domain is out of sync places the VC Domain in maintenance mode temporarily; therefore, it can only be performed
during the execution step.
If VC modules were added to or removed from a VC Domain post-backup, the Domain Synchronization step will fail.
Additional manual synchronization steps must be performed at this time in order to pass this phase of mxsync. See
Appendix E: VCEM resynchronization actions
for more details.
**** Analysis: Domain synchronization ****
**** Section 2 of 5, phase 2 of 2 ****
Synchronize the state of VCEM with the defined VC Domains.
Synchronize VC Domain str00106_vc_domain in VCEM..................[ACTION]
ISSUE: VCEM may be out of sync with the VC Domain.
RESOLUTION: The VC Domain will be checked and, if necessary,
synchronized in VCEM.
Analysis summary:
1 check performed
1 action needed
0 actions require input
0 advisories
0 errors
Analysis completed successfully. You can choose to execute synchronization
actions now, or stop the synchronization process. If the synchronization
process is stopped, it can be restarted later.
>>> Would you like to perform the actions now? (Y/N): y
**** Execution: Domain synchronization ****
**** Section 2 of 5, phase 2 of 2 ****
This may take a few minutes ...
Synchronizing VC Domain str00106_vc_domain ...........................
Synchronize VC Domain str00106_vc_domain in VCEM......................[OK]
Execution summary:
1 action performed
0 advisories
0 errors
>>> Please press [ENTER] to continue:
46