HP Matrix Operating Environment 7.3 Update 1 Release Notes

a. From the HP Matrix Operating Environment menu, click ToolsInfrastructure
Orchestration.
b. Click the Servers tab. Make sure the servers are not being used by checking
the “Usage column.
c. Move the servers under the “Maintenance pool to the desired server pool by
using the “Modify Pool” option.
5. Recreate the service request.
Provisioning failure on Integrity blades BL870c i2, BL890c i2, BL870c i4,
and BL890c i4
Matrix infrastructure orchestration provisioning fails on Integrity server blades BL870c
i2, BL890c i2, BL870c i4, and BL890c i4. The
serverboot.physical.wait.seconds in the hpio.properties file and the
INTEGRITY_POWERON_WAITTIME in the lsa.properties file are not set to the
right values according to the blade models. The wait time consists of waiting for the
Integrity blade to boot completely before infrastructure orchestration or Matrix OE
logical server management executes the power off. This setting is required to prevent
the potential QLogic HBA card EFI/FW from being corrupted while the Virtual Connect
profile is being written to or removed from the NVRAM.
NOTE: The hpio.properties resides under IOinstalledDir/conf.
The lsa.properties resides under VSEinstalledDir/conf/lsa.
Suggested action
1. Measure the time required for the power cycle of the Integrity blade that is
provisioned.
NOTE: The time varies based on the blade model, its memory size, and the
number of QLogic cards. You can measure the power cycle time from the Integrity
blade remote console using OA (Onboard Administrator) or VCEM.
2. Set the serverboot.physical.wait.seconds and
INTEGRITY_POWERON_WAITTIME according to the time measured in step 1.
Use the following parameters as a minimum.
For BL870c i2 and i4 blades:
Set the serverboot.physical.wait.seconds to 540 seconds.
Set the INTEGRITY_POWERON_WAITTIME to 540000 milliseconds.
For BL890c i2 and i4 blades
Set the serverboot.physical.wait.seconds to 1080 seconds.
Set the INTEGRITY_POWERON_WAITTIME to 1080000 milliseconds.
Limitations
IO/OO Load Balancer workflows not able to process large HAProxy configuration
requests
The Create Logical Load Balancer Groups workflow targeting the Load Balancer HAProxy
may fail with the following error message:
The execution of the workflow Create a Logical Load Balancer
Groups has failed.
21