Using HP Global Workload Manager with SAP

5
Prerequisites
All of the steps in this example use basic features included in VSEMgmt and gWLM, so there are no
other prerequisites.
Walkthrough
In this first screen, Virtualization Manager is showing the two target vpars, cutst125 and cutst128.
Weve checked the box for the npar surrounding the two vpars to indicate we want to form an SRD
with all the vpars in that npar, and have them collectively share resources. (Alternatively we could
have selected the boxes next to the two vpars, giving the same result in this case).