FW V06.XX/HAFM SW V08.02.00 HP StorageWorks HA-Fabric Manager Appliance Installation Guide (AA-RU5FB-TE, July 2004)
Chapter 1. Initial Setup
• Ship group kit
, containing:
• HAFM appliance.
• Ten (10) square alignment washers (required for rack-mounting in HP 9000, 10000
and 11000 series racks).
• HAFM application CD-ROM.
• HAFM boot/restore CD-ROM.
• Norton AntiVirus CD-ROM.
• Modem cable with RJ-11 connectors.
• CD-RW (blank).
• HAFM Release Notes.
• 10–ft. Ethernet cable.
• PDU power cord.
• 110–volt AC power cord.
• Null modem cable.
• Modem phone cable.
• Generic documentation for the HAFM appliance.
• Rack-mount hardware kit, containing:
• Two (2) rear brackets (short) that attach to the cabinet (3.0 inches).
• Two (2) optional rear brackets (long) that attach to the cabinet (15.25 inches).
• One (1) left slide rail that attaches to the appliance (19.25 inches).
• One (1) right slide rail that attaches to the appliance (19.25 inches).
• Two (2) two-hole bar nuts for bolting the front and rear brackets together.
• Four (4) three-hole bar nuts for attaching the brackets to the rack-mounting standards.
Figure Figure 1-3 illustrates the front and rear brackets, slide rails, and bar nuts.
hp StorageWorks HA-F abric Manager A ppl iance Installation
Guide
19