FW V06.XX/HAFM SW V08.02.00 HP StorageWorks HA-Fabric Manager Appliance Installation Guide (AA-RU5FB-TE, July 2004)

Chapter 1. Initial Setup
Ship group kit
, containing:
HAFM appliance.
Ten (10) square alignment washers (required for rack-mounting in HP 9000, 10000
and 11000 series racks).
HAFM application CD-ROM.
HAFM boot/restore CD-ROM.
Norton AntiVirus CD-ROM.
Modem cable with RJ-11 connectors.
CD-RW (blank).
HAFM Release Notes.
10–ft. Ethernet cable.
PDU power cord.
110–volt AC power cord.
Null modem cable.
Modem phone cable.
Generic documentation for the HAFM appliance.
Rack-mount hardware kit, containing:
Two (2) rear brackets (short) that attach to the cabinet (3.0 inches).
Two (2) optional rear brackets (long) that attach to the cabinet (15.25 inches).
One (1) left slide rail that attaches to the appliance (19.25 inches).
One (1) right slide rail that attaches to the appliance (19.25 inches).
Two (2) two-hole bar nuts for bolting the front and rear brackets together.
Four (4) three-hole bar nuts for attaching the brackets to the rack-mounting standards.
Figure Figure 1-3 illustrates the front and rear brackets, slide rails, and bar nuts.
hp StorageWorks HA-F abric Manager A ppl iance Installation
Guide
19