HP IAP Version 2.0 Administrator Guide (July 2008)

Power off
To turn off the IA
P, fro m PCC en ter:
# /opt/bin/stop
# /opt/bin/shutdown
Wait a few minutes until the PCC console shutdown is complete before removing po wer from the IAP
systems.
Power on
To power on the I
AP:
1. Make sure the IAP switch(es) are powered up. Once power is restored, the switch(es) should
automatically come up.
2. Power on the ki
ckstart server. Wait ve minutes.
3. Power on everything else. Order is insignicant, unless there has been a p ower failure (see
below).
How to restart IAP after a power failure
After a power failure has occurre d, a specic power on sequence is required:
1. Power off all systems.
2. Power on the kickstart server.
3. When the kickstart machine is running, log on and issue the commands:
/etc/init.d/postgresql stop
/etc/init.d/postgresql start
4. Wait for the start to complete successfully.
5. Power on db2
, routers,and loadbalancers.
6. Power on smart cells.
7. Power on metaservers.
8. Power on re
maining servers.
9. Wait for a
ll machines to start, then log in to the PCC console and issue the command:
/opt/bin/restart
10. Once IAP has restarted, verify (with the PCC web interface) that the IAP is running and monitoring
is report
ing system availabilities as expected.
NOTE:
In the ev ent both routers go down, the system should be restarted with /opt/bin/restart once
the route
rs are back up.
Maximum le size
The maximum le size that the IAP API allows for all letypesis1.47GB.
16
IAP overview