HP StorageWorks SAN Virtualization Services Platform SMI-S User Guide (5697-0209, April 2010)
CommentsDescriptionProperty Name
SNIA_Synchronized.CopyState
Last requested state for this association:
Not the actual state.
• JobInit, 6 ( Synchronized )
• JobNormalProgress!==100 4 ( Syn-
chronized )
• JobNormal Progress==100 15 ( Not
Applicable )
• JobPaused 15 ( Not Applicable )
• JobFailed 15 ( Not Applicable )
• JobBreak 15 ( Not Applicable )
• JobDelete 15 ( Not Applicable )
• While the operation is ongoing, Reques-
tedCopyState retains its modified value,
CopyState retains the current (volatile)
value as the operation progresses.
• At the point where the operation has
completed and the CopyState value ==
RequestedCopyState value, Requested-
CopyState {15 Not Applicable}, and
CopyState changes the current (poten-
tially volatile) value of this association.
RequestedCopyS-
tate
Available SNIA Values:
• 0 ( Unknown )
• 2 ( Completed )
• 3 ( Dormant )
• 4 ( Initializing )
• 5 ( Preparing )
• 6 ( Synchronizing )
• 7 ( Resyncing )
• 8 ( Restoring )
• 9 ( Fracturing )
• 10 ( Splitting )
• 11 ( Failing over )
• 12 ( Failing back )
• 13 ( Aborting )
• 14 ( Mixed )
• 15 ( Not Applicable )
• 16 ( Suspending )
• 17 ( Requires fracture )
• 18 ( Requires resync )
• 19 ( Requires activate )
• 20 ( Pending )
• 0x8000.. ( Vendor Specific )
• JobInit, 6 ( Synchronizing )
• JobNormal, and TotalProgress=100 6
( Synchronizing )
• AppJobNormal and Total Pro-
gress==100, set to 2 ( Completed )
• JobPaused, 3 ( Dormant)
• JobBreak, 9 ( Fracturing )
• JobDelete 9 ( Fracturing )
• eMultiAppJobFailed, 15 ( Not Applic-
able )
ProgressStatus
Percent of completion - only means pro-
gress for delete PiT
Total ProgressPercentSynced
Date and time this association was created.Created TimeWhenEstablished
Whether consistency is enabledtrueConsistencyEnabled
Replication Services Profile206