HP StorageWorks Storage Mirroring Reporting Center User's Guide (T5437-96025, November 2010)

Scheduling reports Page 22 of 35
Scheduling reports
You can schedule when reports are automatically generated.
1. Select Tools, Scheduled Report Editor.
2. Specify a Name to identify the scheduled report and, if desired, an optional
Description.
3. Select your Schedule from the drop-down list. Click Edit to create, modify, or
delete the schedules in the list.
a. On the Schedule List dialog box, click New to create a new schedule.
b. Specify a Name for the schedule.
c. Hover the mouse cross cursor on the grid to indicate the day and time you
want the report to run and click to select.