HP StorageWorks HSG60 and HSG80 Array Controller and Array Controller Software Maintenance and Service Guide (EK-G80MS-SA. C01, March 2005)

Upgrading the Subsystem
193HP StorageWorks HSG60 and HSG80 Array Controller and Array Controller Software
Maintenance and Service Guide
Note: In step 16 and step 17, controller B is updated first. After controller B restarts, it
automatically shuts down controller A if you are upgrading from ACS V8.6-
x
to
V8.8-
x
. If you are upgrading from ACS V8.7-
x
to V8.8-
x
, manually shut down
controller A by entering the SHUTDOWN OTHER_CONTROLLER command.
16. Upgrade the software on controller B by performing the following substeps:
Note: After step 16 is performed, the previous ACS version cannot be restored to this
subsystem.
a. Remove the program card ESD cover from controller B.
b. Press and hold the controller Reset button while ejecting the old program
card.
c. After ejecting the program card, release the Reset button.
d. Press and hold the Reset button while inserting the new program card.
e. After the card is fully inserted, release the Reset button.
Controller B restarts.
Note: A controller restart can take as long as 60 seconds, indicated by the temporary
cycling of the port LEDs and a flashing Reset button. Disregard messages pertaining to
misconfigured controllers or failover status.
f. Install the program card ESD cover on controller B.
17. Verify that controller B completed initialization by performing the following
substeps:
a. Connect a PC or terminal to the maintenance port of controller B.
b. Verify that the CLI prompt for controller B is displayed.
Note: Wait for the CLI prompt before proceeding.