HP StorageWorks Data Replication Manager HSG80 ACS Version 8.7P Configuration Guide (AA-RPHZF-TE, March 2004)

Troubleshooting
169Data Replication Manager HSG80 ACS Version 8.7P Configuration Guide
From the SWITCHSHOW command output, we know that there is an ISL from the switch
named sw11 to a switch named sw12 (port 15). Figure 27 is a picture of the cabling
information we have gathered so far. It is drawn from Table 12, which shows that:
Port 0 of sw11 (where we issued the SWITCHSHOW command) is cabled to the HBA
whose WWID ends in -C9F0.
Port 13 of sw11 is cabled to port 1 of the bottom controller.
Port 14 of sw11 is cabled to port 2 of the bottom controller.
Port 15 of sw11 is cabled via an ISL to sw12.
Figure 27: First cabling diagram
Step 5: Issue switchShow Command from the Second Switch
Telnet into another switch and issue a SWITCHSHOW command at the switch prompt to
acquire the port connection information:
sw13:admin> switchShow
Table 13 shows typical output from the SWITCHSHOW command.
Switch "SW12"
014
13 15
Switch "SW11"
Domain 1
Port 1
Bottom controller
-9DE1
Port 2
Bottom controller
-9DE2
Port 1
Top controller
-9DE3
Port 2
Top controller
-9DE4
HBA . . .C9F0
CXO7652A