FW 07.00.00/HAFM SW 08.06.00 McDATA SANpilot User Manual (620-000160-230, April 2005)

3
3-8
McDATA® Sphereon 3032 and 3232 Fabric Switches Installation and Service Manual
Diagnostics
5
Is the EFC Manager application active?
NO YES
Go to step 7.
6
Reboot the EFC Server or customer-supplied server PC. If the
customer-supplied server does not use the Windows 2000 operating
system, refer to the supporting documentation to reboot the server.
a. At the Windows 2000 desktop, click Start at the left side of the
task bar (bottom of the desktop), then select Shut Down. The
Shut Down Windows dialog box displays (Figure 3-1).
Figure 3-1 Shut Down Windows Dialog Box
b. Select the Shut Down option from the list box and click OK. The
EFC Server powers down.
c. Wait approximately 30 seconds and press the power ( ) button
on the liquid crystal display (LCD) panel to power on the server
and perform power-on self-tests (POSTs). During POSTs:
1. The green LCD panel illuminates.
2. The green hard disk drive (HDD) LED blinks momentarily,
and processor speed and random-access memory
information display momentarily at the LCD panel.