HP StorageWorks HSG60 and HSG80 Array Controller and Array Controller Software Maintenance and Service Guide (EK-G80MS-SA. C01, March 2005)

Replacing BA370, M2100 & M2200 Enclosure Elements
151HP StorageWorks HSG60 and HSG80 Array Controller and Array Controller Software
Maintenance and Service Guide
WARNING: The ECB is a sealed, rechargeable, lead acid battery that must
be recycled or disposed of properly according to local regulations or policies
after replacement.
Do not
incinerate the battery. The ECB displays the
following label:
Replacing an ECB with the subsystem powered on
Use the following steps to replace the ECB with the BA370 subsystem powered
on:
Note: For array controllers in M2100 or M2200 enclosures, the
FRUTIL
procedure for
a dual-redundant controller configuration assumes that a single ECB with a dual
battery is installed and an empty bay is available for the replacement ECB. If an empty
bay is not available, place the replacement ECB on top of the enclosure. After
removing the old ECB, carefully insert the replacement ECB into the empty bay.
For array controllers in a BA370 enclosure, there are two slots for each ECB.
1. Connect a PC or terminal to the maintenance port of the array controller that
requires an ECB replacement.
The array controller connected to the PC or terminal becomes “this
controller.”
2. For array controllers in a M2200 enclosure, enter the following command to
verify that system time is set:
SHOW THIS_CONTROLLER FULL
If the system time is not set or current, enter the current time using the
following command:
SET THIS_CONTROLLER TIME=<dd-mm-yyyy:hh:mm:ss>
3. Start FRUTIL with the following command:
RUN FRUTIL
Pb