HP StorageWorks HSG60 and HSG80 Array Controller and Array Controller Software Maintenance and Service Guide (EK-G80MS-SA. C01, March 2005)

Replacing BA370, M2100 & M2200 Enclosure Elements
153HP StorageWorks HSG60 and HSG80 Array Controller and Array Controller Software
Maintenance and Service Guide
Figure 64: ECB status LEDs
c. Remove the old ECB and install the blank bezel in this vacant bay.
d. Proceed to step 7 on page 154.
6. Replace the ECB:
Note: Do not wait for the battery status light on the replacement ECB to turn solid
green.
For a single ECB:
a. Remove the old ECB and insert the replacement ECB into the same
location.
b. Connect the replacement ECB to the open end of the ECB Y-cable
attached to the old ECB, and then quickly disconnect the Y-cable
from the old ECB.
For dual ECBs:
a. Connect the replacement ECB to the open end of the ECB Y-cable
attached to the old ECB, and then quickly disconnect the Y-cable
from the old ECB.
b. Place the replacement dual ECB in a temporary location.
1 ECB charged LED
2 ECB charging LED
3 ECB fault LED
5019
1
2
3