HP StorageWorks HSG60 and HSG80 Array Controller and Array Controller Software Maintenance and Service Guide (EK-G80MS-SA. C01, March 2005)

Replacing BA370, M2100 & M2200 Enclosure Elements
156 HP StorageWorks HSG60 and HSG80 Array Controller and Array Controller Software
Maintenance and Service Guide
4. Remove power to the subsystem by turning off both AC input boxes for all
BA370 enclosures, and then disable the ECBs.
Caution: The ECB cable has a 12-volt and a 5-volt pin. Improper handling or
misalignment while connecting or disconnecting it can cause these pins to
contact ground, resulting in cache module damage.
5. Replace the ECB:
For a single ECB:
a. Remove the old ECB and insert the replacement ECB into the same
location.
b. Connect the replacement ECB to the open end of the ECB Y-cable
attached to the old ECB, and then quickly disconnect the Y-cable
from the old ECB.
For dual ECBs:
a. Connect the replacement ECB to the open end of the ECB Y-cable
attached to the old ECB, and then quickly disconnect the Y-cable
from the old ECB.
b. Place the replacement dual ECB in a temporary location.
6. Restore power to the subsystem.
The controllers automatically restart.
Note: A controller restart can take as long as 60 seconds, indicated by the temporary
cycling of the port LEDs and a flashing Reset button.
Note: If the controller did not restart, press the Reset button.
7. Set the controller time.
8. Start FRUTIL with the following command:
RUN FRUTIL
9. Enter Y(es) to confirm the intent to replace the “this controller” ECB with
power off.