HP StorageWorks HSG80 ACS Solution Software V8.8 for Sun Solaris Installation and Configuration Guide (AA-RV1RA-TE, March 2005)

FC Configuration Procedures
140 HSG80 ACS Solution Software V8.8 for Sun Solaris Installation and Configuration Guide
Figure 39 shows a controller pair with failover cabling showing one HBA per
server with HSG80 controller in transparent failover mode.
Figure 39: Controller pair failover cabling
Configuring a Controller Pair Using CLI
To configure a controller pair using CLI:
Configuring Controller Settings.
Restarting the Controller.
Setting Time and Verifying All Commands.
Plugging in the FC Cable and Verify Connections.
Repeating Procedure for Each Host Adapter.
Verifying Installation.
Enter a
SHOW THIS command to verify the node ID:SHOW THIS
See “Worldwide Names (Node IDs and Port IDs)” on page 56, for the
location of the sticker.
1 Controller A
2 Controller B
3 Host port 1
4 Host port 2
5 Cable from the switch to the host FC adapter
6 FC switch
CXO6887B
6
6
5
5
1
2
4
3