HP StorageWorks P9000 Performance Advisor Software v5.3 User and Troubleshooting Guide (T1789-96322, August 2011)

3. Based on your requirement, select the Collection Period as One Time or Recurring.
If you select the Collection Period as One Time, proceed to step 4.
If you select the Collection Period as Recurring, the following schedule options are enabled:
Collection Schedule: Displays Daily, Weekly, and Monthly.
DescriptionCollec-
tion
Schedule
By default, Weekly is selected as the collection schedule. The corresponding Day of
the Week list displays the week days. If you want to configure a weekly schedule:
Weekly
Select the week day when you want the schedule to be executed.
Select the time (hour : mins) when you want the schedule to be executed, from
the Start Time lists.
Specify the number of times the schedule should repeat, in the No. of Occurrences
box.
The data for a duration of one week prior to the scheduled time is exported.
Clicking the Monthly collection schedule displays the Monthly Schedule. The following
options are provided in a monthly schedule:
Monthly
Based on Date, where you select a date in a month. The Date of the Month list
is enabled when you select Based on Date.
Based on Day, where you select a day in a week. The Day of the Week and
Week of the Month lists are enabled when you select Based on Day. Select a
day and the corresponding week in a month to execute the schedule.
If you want to configure a monthly schedule:
Select the date of the month when you want the schedule to be executed.
OR
Select the day and the corresponding week when you want the schedule to be
executed.
Select the time (hour : mins) when you want the schedule to be executed, from
the Start Time lists.
Specify the number of times the schedule should repeat, in the No. of Occurrences
box.
The data for a duration of one month prior to the scheduled time is exported.
Clicking the Daily collection schedule displays the start time. If you want to configure
a daily schedule:
Daily
Select the time (hour : mins) when you want the schedule to be executed, from
the Start Time lists.
Specify the number of times the schedule should repeat, in the No. of Occurrences
box.
The previous day's data is exported. For example, if the export DB report is scheduled
on 01/01/2010 at 10:00:00 hrs, the data is exported from 12/31/2009 10:00:00
hrs to 01/01/2010 10:00:00 hrs.
4. Provide a name in the File Name box. The name must have a minimum of two characters and
can have a maximum of 80 characters. P9000 Performance Advisor appends the name that you
provide to the file names of all the .csv files that it generates.
5. From the Array list, select the XP or the P9000 disk array for which you want to save or schedule
the Export DB report.
HP StorageWorks P9000 Performance Advisor Software User Guide 183