HP StorageWorks P9000 Performance Advisor Software v5.3 User and Troubleshooting Guide (T1789-96322, August 2011)

F Appendix F
Forecasting ThP pool performance
Guidelines for selecting data range to receive an optimal forecast
To validate the forecasted data, we need to understand the trend of the existing data, as the forecasted
data is an extension of the existing trend. The forecasted data represents a trend of the ThP pool
occupancy values and not the actual values. The following graph indicates the trend of the actual
values. The forecasted values be an extension of the trend of the selected data points.
The following graph indicates the forecasted graph in red. The forecasted data starts below the actual
value and gradually grows upwards, based on the trend of the actual data.
NOTE:
P9000 Performance Advisor does not plot the trend as part of the charts. The trend shown in the
preceding image is only for your reference.
The accuracy of the forecasting depends on the following factors:
Data range size: The accuracy of the forecast is directly proportional to the size of data chosen.
So, select a range as large as possible. HP recommends to have at least 100 data points for
P9000 Performance Advisor to project an optimal forecast.
End date of the selection: The end date should be near to the current date. If some of the recent
past data is omitted, the forecasted data not account for variances in that interval.
HP StorageWorks P9000 Performance Advisor Software User Guide 463